- To carry out the planning for the installation schedule, installation design drawing/documents and submit to customer for approval etc.
- To prepare and submit installation document/method statement to customer for approval.
- To attend customer meeting and SWCs interface co-ordination meeting, CSD/SEM working meeting, RCP co-ordination meeting, APSS/Architect interface meeting, CIP co-ordination meeting, construction meeting, 4WRP meeting, Site working/safety meeting.
- To review and comment on Civil’s ALP drawings, CSD/SEM drawings , APS interface details drawings and update of Construction drawings
- To attend site casting inspection and pull through test etc.
- To submit the Permit To Work (PTW) to customer for approval prior to the site installation work.
- To provide the required installation materials, cables, field equipment and devices for the site installation.
- To coordinate & supervise sub-contractor for the site installation work, including equipment installation, cable laying/termination/testing etc.
- To attend site inspection/PGI with customer and update design/As-built drawing.
- To submit daily and monthly installation progress report and photos.
Notes: If you’re interested with the above job, please click button [Apply the job @Company’s site] below to brings you directly to the company’s site.
Job Features
Job Category | Engineering |
Job Requisition Id | 10030 |
Business Area | Urban Solutions |
Posted Date | 15 Jun 2023 |